67 feet (frontage) × 830 feet (depth/length)
Total Area: 55,610 sq. ft
Dairy / Ghee Processing & Packaging Unit
Warehousing & Cold Storage for dairy products
Administrative Office + Dispatch Hub
Production Block
Dairy/milk reception, processing, clarification & ghee production.
Packaging Area
Bottling, pouching, tin/container filling, labeling.
Cold Storage & Warehouse
Chilled storage for milk products.
Dry warehouse for finished ghee packs.
Administrative Block
Sales, accounts, QC, R&D.
Utility Area
Boiler, refrigeration plant, DG set, ETP/STP.
Dispatch & Logistics Zone
Wide driveway for milk tankers, goods carriers, and distribution vans.
Our comprehensive approach includes site preparation, structural engineering, and quality construction management to ensure every project meets the highest standards.
With over 30 years of experience in steel construction, Starlit Steel Building Solutions delivers projects that stand the test of time. Our expertise ensures optimal structural integrity and cost-effectiveness.
Every project is backed by our commitment to engineering excellence and customer satisfaction.